top of page
Marcellin College, Bulleen
MCC delivered a suspended concrete bridge connecting two campus buildings at Marcellin College. The works required accurate formwork, reinforcement, and finishing to achieve architectural precision and long-term structural stability.

bottom of page
![logo_final [Converted].png](https://static.wixstatic.com/media/b6e990_6172fd58fb7b4fbc8b840d23dfb19da5~mv2.png/v1/fill/w_980,h_966,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/logo_final%20%5BConverted%5D.png)






















